CFP last date
22 April 2024
Reseach Article

An Imperfect Production Inventory Model with Remanufacturing of Return and Defective Items

by Prasanta Kumar Ghosh, Jayanta Kumar Dey
International Journal of Computer Applications
Foundation of Computer Science (FCS), NY, USA
Volume 150 - Number 8
Year of Publication: 2016
Authors: Prasanta Kumar Ghosh, Jayanta Kumar Dey
10.5120/ijca2016911588

Prasanta Kumar Ghosh, Jayanta Kumar Dey . An Imperfect Production Inventory Model with Remanufacturing of Return and Defective Items. International Journal of Computer Applications. 150, 8 ( Sep 2016), 6-13. DOI=10.5120/ijca2016911588

@article{ 10.5120/ijca2016911588,
author = { Prasanta Kumar Ghosh, Jayanta Kumar Dey },
title = { An Imperfect Production Inventory Model with Remanufacturing of Return and Defective Items },
journal = { International Journal of Computer Applications },
issue_date = { Sep 2016 },
volume = { 150 },
number = { 8 },
month = { Sep },
year = { 2016 },
issn = { 0975-8887 },
pages = { 6-13 },
numpages = {9},
url = { https://ijcaonline.org/archives/volume150/number8/26111-2016911588/ },
doi = { 10.5120/ijca2016911588 },
publisher = {Foundation of Computer Science (FCS), NY, USA},
address = {New York, USA}
}
%0 Journal Article
%1 2024-02-06T23:55:23.630563+05:30
%A Prasanta Kumar Ghosh
%A Jayanta Kumar Dey
%T An Imperfect Production Inventory Model with Remanufacturing of Return and Defective Items
%J International Journal of Computer Applications
%@ 0975-8887
%V 150
%N 8
%P 6-13
%D 2016
%I Foundation of Computer Science (FCS), NY, USA
Abstract

This paper focuses on an inventory model considering imperfect manufacturing and re-manufacturing system under single management. In manufacturing system, the items are produced from original raw materials but in re-manufacturing process, returned and defective items produced in previous manufacturing process are the raw materials. Both the production system shift from ‘ in control state ‘ to ‘out-control state’ at any random time and starts to produce imperfect items. Here the screening process of produced items in both production system (manufacturing and remanufacturing) has been considered during production period. Some portion of the defective items produced from manufacturing process are transformed as good as new after some rework and remaining portion are used as a raw materials in re-manufacturing process. Returned items are collected from the market continuously and stock them for use as raw-materials in re-manufacturing system. Inventory costs of produced items, return and defective items are calculated and total cost per unit time is minimized for optimal return lot. Finally some numerical example has been illustrated to study the practical feasibility of the model.

References
  1. Almari, A. A. (2011). Theory and methodology on the global optimal solution to a general reverse logistic inventory model for deteriorating items and time varying rates, Computer and Industrial Engineering, 60(2), 236-247.
  2. Ben-Daya,M., Hariga,M.(2000). Economic lot scheduling problem with imperfect production processes: Journal of the Operational Research Society, 51, 875-881.
  3. Chung, K.J.,Hou, K.L.(2003).An optimal production run time with imperfect production processes and allowable shortages: Computers and Operations Research, 20, 483-490.
  4. Dobos, I. and Richter, K. (2003). A production /recycling model with stationary demand and return rates, Central European Journal of Operational Research, 11 (1), 35-46.
  5. Dobos, I. and Richter, K. (2004). An extended production /recycling model with stationary demand and return rates, International Journal of Production Economics, 90(3), 311-323.
  6. Dobos, I. and Richter, K. (2006).A production /recycling model with quality considerations. International Journal of Production Economics, 104(2), 571-579.
  7. Ghosh, Prasanta Kumar and Dey, Jayanta Kumar (2016). Optimal Imperfect Production Inventory Model with Machine Breakdown and Stochastic Repair Time, World Journal of Research and Review, 3(1), 59-65.
  8. Goyal, S.K., Cardenas-Barron, L.E.(2002).Note on: Economic production quantity model for items with imperfect quality-a practical approach: International Journal of Production Economics,77,85-87.
  9. Goyal, S.K., Hung, C.K., Chen, H.K.(2003).A simple integrated production policy of an imperfect item for vender and buyer Production Planning and Control, 14, 596-602.
  10. Hayek,P.A., Salameh. M.K.,:Production lot sizing with the reworking of imperfect quality items produced. Production Planning and Control12,584-590.
  11. Hazari,S.,,Maity, K., Dey, J. K. and Kar, S. (2014a).Optimal dynamic production and price for reliability-dependent imperfect production with inventory-level-dependent demand in uncertain environment, Journal of Uncertainty Analysis and Applications, 2(9),2014.
  12. Hazari, S., Maity, K., Dey, J. K. and Kar, S. (2014b). An Interactive Method for Two-plants Production Inventory Control with Two-Warehouse Facility under Imprecise Environment, International Journal of Computer Applications, 96(21), 1-13, 2014.
  13. Hazari, S., Maity, K., Dey, J. K. and Kar, S. (2015).Advertisement policy and reliability dependent imperfect production inventory control problem in bi-fuzzy environment. International Journal of Operational Research, 22(3), 342-365.
  14. Inderfurth, K., Lindner, G. and Rachaniotis, N. P. (2005).Lot sizing in a production system with rework and product deterioration. International Journal of Production Research, 43(7), 1355-1374.
  15. Jabar, M.Y. and Rosen, M.A (2008), The economic order quantity repair and waste disposal model with entropy cost, European Journal of Operational Research, 108 (1), 109-120.
  16. Jaber, M.Y. and El Saadany, Ahmed M.A (2010).An economic production and remanufacturing model with learning effects, International Journal of Production Economics, 104(2), 571-579.
  17. Konstantaras, I. and and Papachristos, S. (2006).Lot sizing for a single-product recovery system with backordering, International Journal of Production Research, 44(10), 2031-2045.
  18. Manna, A.K., Dey, J.K., Mondal, S.K.(2014).Three-layer supply chain in an imperfect production inventory model with two storage facilities under fuzzy rough environment. Journal of Uncertainty Analysis and Applications: 2:17.
  19. Manna, A.K., Dey, J.K., B. Das and Mondal, S.K.(2016).An EPQ model with promotional demand in random planning horizon: population varying genetic algorithm approach. Journal of Intelligent Manufacturing,1-17.
  20. Nahmias, S and Rivera, H. (1979).A deterministic model for a repairable item inventory system with a finite repair rate, International Journal of Production Research, 17(3), 215-221.
  21. Nenes, G., Panagiotidou, S. and Dekker, R. (2010). Inventory control policies for inspections and remanufacturing of returns: A case study, International Journal of Production Economics, 125, 300-312.
  22. Richter, K. (1996a). The EOQ repair and waste disposal model with variable setup numbers. European Journal of Operational Research, 95 (2), 313-324.
  23. Richter, K. (1996b). The extended EOQ repair and waste disposal model, International. Journal of Production Economics, 45 (1-3), 443-447.
  24. Richter, K. (1997). Pure and mixed strategies for the EOQ repair and waste disposal problem, OR Spectrum, 19(2), 123-129.
  25. Rosenblatt.M.J., Lee H.L.,: Economic production cycle with imperfect production process.IIE Transactions17,48-54.
  26. Sana.S.,GoyelS.K.,Chaudhuri K.S.,[2007a]:An imperfect production process in a volume flexible inventory model. International Journal of Production Economics 105.548-559.
  27. Schrady, D.A. (1967).A deterministic inventory model for repairable items, Naval Research Logistics Quarterly, 14(3), 391-398.
  28. Teunter, R.H. (2001). Economic ordering quantities for recoverable item inventory system, Naval Research Logistics Quarterly, 48(6), 484-495.
  29. Teunter, R.H. (2004).Lot-sizing for inventory systems with product recovery, Computer and Industrial Engineering, 46(3), 431-441.
Index Terms

Computer Science
Information Sciences

Keywords

Imperfect Production Manufacturing system Returned- items Remanufacturing system Rework Return lot.