CFP last date
22 April 2024
Reseach Article

Studying the Interrelationship amongst Various Barriers in Adoption of BIM in Developing Countries using ISM Methodology

by Arnav Jain, Remica Aggarwal, Veena Aggarwal
International Journal of Computer Applications
Foundation of Computer Science (FCS), NY, USA
Volume 182 - Number 44
Year of Publication: 2019
Authors: Arnav Jain, Remica Aggarwal, Veena Aggarwal
10.5120/ijca2019918576

Arnav Jain, Remica Aggarwal, Veena Aggarwal . Studying the Interrelationship amongst Various Barriers in Adoption of BIM in Developing Countries using ISM Methodology. International Journal of Computer Applications. 182, 44 ( Mar 2019), 30-34. DOI=10.5120/ijca2019918576

@article{ 10.5120/ijca2019918576,
author = { Arnav Jain, Remica Aggarwal, Veena Aggarwal },
title = { Studying the Interrelationship amongst Various Barriers in Adoption of BIM in Developing Countries using ISM Methodology },
journal = { International Journal of Computer Applications },
issue_date = { Mar 2019 },
volume = { 182 },
number = { 44 },
month = { Mar },
year = { 2019 },
issn = { 0975-8887 },
pages = { 30-34 },
numpages = {9},
url = { https://ijcaonline.org/archives/volume182/number44/30447-2019918576/ },
doi = { 10.5120/ijca2019918576 },
publisher = {Foundation of Computer Science (FCS), NY, USA},
address = {New York, USA}
}
%0 Journal Article
%1 2024-02-07T01:15:09.044408+05:30
%A Arnav Jain
%A Remica Aggarwal
%A Veena Aggarwal
%T Studying the Interrelationship amongst Various Barriers in Adoption of BIM in Developing Countries using ISM Methodology
%J International Journal of Computer Applications
%@ 0975-8887
%V 182
%N 44
%P 30-34
%D 2019
%I Foundation of Computer Science (FCS), NY, USA
Abstract

Building Information Modelling is an emerging area of technology which deals with the process of creating and using design models for design, construction and operation of projects. However, it is still in its nascent stage in developing countries and suffers due to various barriers which hinder its development and adoption. Present research work deals with recognizing such barriers in adoption of BIM in developing countries like India and further studying the inter-relationships amongst them using ISM methodology.

References
  1. Sawhney, A. and Singhal, P. 2013. Drivers and Barriers to the Use of Building Information Modelling in India. International Journal of 3-D Information Modeling (IJ3DIM). 2(3), 46-63.
  2. Ghoddousi, P., & Hosseini, M. R. 2012. A survey of the factors affecting the productivity of construction projects in Iran. Technological and Economic Development of Economy. 18(1), 99-116.
  3. Kiani, I., Sadeghifam, A. N., Ghomi, S. K. and Marsono, A. K. B. 2015. Barriers to Implementation of Building Information Modeling in Scheduling and Planning Phase in Iran. Australian Journal of Basic and Applied Sciences . 9(5), 91-97.
  4. Matarneh , R.T. and Hamed , S. 2017. Barriers to adoption of building information modelling in the Jordanian Building industry , Open Journal of Civil Engineering . 07 (03) , 325-335
  5. Wadhah , A.H. , Abbas , M.A. and Nagham , N.A. 2018. Barriers of adoption building information modelling in construction projects of Iraq. Engineering Journal , 22(2). DOI: 10.4186/ej2018.22.2.59.
  6. Hosseni , M.R , Azari , E. , Tivendale , L. and Chileshe , N. (2016), Barriers to adoption of building information modelling in Iran : preliminary results. https://www.researchgate.net/publication/281209928_Barriers_to_adoption_of_building_information_modeling_BIM_in_Iran_Preliminary_results .
  7. Zakaria, B. Z., Mohamed Ali, N., Tarmizi Haron, A., Marshall-Ponting, A.J. and Abd Hamid, Z. 2013, 'Exploring the adoption of Building Information modelling in the Malaysian construction industry.
  8. usir.salford.ac.uk/30827/1/IJRET_110208060_FINAL.pdf
  9. Abubakar, M., Ibrahim, Y., Kado, D. and Bala, K. 2014. Contractors’ Perception of the Factors Affecting Building Information Modelling (BIM) Adoption in the Nigerian Construction Industry. Paper presented at the Computing in Civil and Building Engineering (2014), Orlando, Florida, United States.
  10. Chan, C. T. W. 2014. Barriers of Implementing BIM in Construction Industry from the Designers’ Perspective: A Hong Kong Experience. Journal of System and Management Sciences. 4(2), 24-40.
  11. Rogers, J., Heap-Yih, C., Preece, C., McCaffer, R. and Thomson, D. 2015. Adoption of Building Information Modelling technology (BIM): perspectives from Malaysian engineering consulting services firms. Engineering, Construction and Architectural Management. 22(4). Glendale, CA: Pyrczak Pub.
  12. Nanajkar, A. and Gao, Z. 2014. BIM Implementation Practices at India's AEC Firms. Paper presented at the International Conference on Construction and Real Estate Management, Kunming, China.
  13. Warfield, J., N. 1974. Developing interconnection matrices in structural modeling. IEEE Transactions on System, Man, and Cybernetics (SMC) .4 (1), 81-87.
Index Terms

Computer Science
Information Sciences

Keywords

Interpretive Structural Modeling Methodology (ISM) Building Information Modeling (BIM) Architectural Engineering and Construction (AEC) industry