CFP last date
20 May 2024
Reseach Article

Role of Requirement Management as a CMMI Process Area in Requirement Engineering

by Samina Jan, Muhammad Nadeem Majeed
International Journal of Computer Applications
Foundation of Computer Science (FCS), NY, USA
Volume 51 - Number 19
Year of Publication: 2012
Authors: Samina Jan, Muhammad Nadeem Majeed
10.5120/8152-1892

Samina Jan, Muhammad Nadeem Majeed . Role of Requirement Management as a CMMI Process Area in Requirement Engineering. International Journal of Computer Applications. 51, 19 ( August 2012), 25-28. DOI=10.5120/8152-1892

@article{ 10.5120/8152-1892,
author = { Samina Jan, Muhammad Nadeem Majeed },
title = { Role of Requirement Management as a CMMI Process Area in Requirement Engineering },
journal = { International Journal of Computer Applications },
issue_date = { August 2012 },
volume = { 51 },
number = { 19 },
month = { August },
year = { 2012 },
issn = { 0975-8887 },
pages = { 25-28 },
numpages = {9},
url = { https://ijcaonline.org/archives/volume51/number19/8152-1892/ },
doi = { 10.5120/8152-1892 },
publisher = {Foundation of Computer Science (FCS), NY, USA},
address = {New York, USA}
}
%0 Journal Article
%1 2024-02-06T20:50:49.319176+05:30
%A Samina Jan
%A Muhammad Nadeem Majeed
%T Role of Requirement Management as a CMMI Process Area in Requirement Engineering
%J International Journal of Computer Applications
%@ 0975-8887
%V 51
%N 19
%P 25-28
%D 2012
%I Foundation of Computer Science (FCS), NY, USA
Abstract

The research shows role of requirement management as a CMMI process area in requirement engineering (a phase of software engineering). Requirement engineering (RE) activity consists of several activities like requirement elicitation by feasibility studies, requirement analysis, requirement validation and requirement management. While performing RE, recognized formal standards should follow like CMMI, ISO etc. Proposed work helps in RE process by acquiring CMMI requirement management process area at level 2. There is confusion in the minds of software personnel between the requirements management process area in CMMI and manage requirements activity in the requirement engineering. So they don't consider requirement management process area as development improvement approach, they think that we don't need anything which requires explicit methods to apply on existing process. Mistake leads to inefficient requirement engineering. The study gives an idea about importance of requirement management while gathering, analyzing and implementing the requirements which are given by the stakeholders. Sometimes stakeholders don't know about their actual requirements and due to this, misunderstanding takes place which brings dissatisfaction of stakeholders and ultimately results poor reputation of organizations.

References
  1. Wang. X, Bai. Y, Cai. C and Liu. K. 2010. Research on Organizational Software Requirement Management and its Information Support. 2nd International Conference on Industrial and Information Systems Mechanics & Electronic Engineering Faculty Shanghai Second Polytechnic University, Shanghai China.
  2. Justin J, Lin. Y and Sung. Y. 2007 . Computer Supported Cooperative Work in Design Collaborative Requirement Management System Developed for CMMI-Coherent Software Engineering. Proceedings of the 11th International Conference on Department of Industrial Engineering and Management, Chaoyang University of Technology, Taiwan.
  3. Xie. Y, Tang. T, Xu. T and Zhao. L . 2010. Research on Requirement Management for Complex Systems. 2nd International Conference on Computer Engineering and Technology (ICCET), Beijing Jiaotong University(BJTU), Beijing, China.
  4. Lee. E. S and Bae. J. M. 2007. Design Opportunity Tree for Requirement Management and Software Process Improvement. International Conference on Multimedia and Ubiquitous Engineering pp395-400 .
Index Terms

Computer Science
Information Sciences

Keywords

CMMI process area requirement management requirement engineering