CFP last date
20 May 2024
Reseach Article

Reliability Measures of a Computer System with Arrival Time of the Server and Priority to H/W Repair over S/W Up-gradation

by J. K. Sureria, S. C. Malik
International Journal of Computer Applications
Foundation of Computer Science (FCS), NY, USA
Volume 65 - Number 13
Year of Publication: 2013
Authors: J. K. Sureria, S. C. Malik
10.5120/10987-6148

J. K. Sureria, S. C. Malik . Reliability Measures of a Computer System with Arrival Time of the Server and Priority to H/W Repair over S/W Up-gradation. International Journal of Computer Applications. 65, 13 ( March 2013), 44-48. DOI=10.5120/10987-6148

@article{ 10.5120/10987-6148,
author = { J. K. Sureria, S. C. Malik },
title = { Reliability Measures of a Computer System with Arrival Time of the Server and Priority to H/W Repair over S/W Up-gradation },
journal = { International Journal of Computer Applications },
issue_date = { March 2013 },
volume = { 65 },
number = { 13 },
month = { March },
year = { 2013 },
issn = { 0975-8887 },
pages = { 44-48 },
numpages = {9},
url = { https://ijcaonline.org/archives/volume65/number13/10987-6148/ },
doi = { 10.5120/10987-6148 },
publisher = {Foundation of Computer Science (FCS), NY, USA},
address = {New York, USA}
}
%0 Journal Article
%1 2024-02-06T21:18:44.698102+05:30
%A J. K. Sureria
%A S. C. Malik
%T Reliability Measures of a Computer System with Arrival Time of the Server and Priority to H/W Repair over S/W Up-gradation
%J International Journal of Computer Applications
%@ 0975-8887
%V 65
%N 13
%P 44-48
%D 2013
%I Foundation of Computer Science (FCS), NY, USA
Abstract

The main emphasis of this paper is on the evaluation of some important reliability measures of a computer system considering the concepts of redundancy, priority in repair disciplines and arrival time of the server. Two identical units of a computer system are taken up-one unit is initially operative and the other is kept as spare in cold standby. There is a direct independent failure of h/w and s/w from normal mode. The system is repaired at its h/w failure while s/w is up-graded as per requirements. Priority is given to the h/w repair over the s/w up-gradation. Failure time of the system is exponentially distributed while the distributions of h/w repair time, s/w up-gradation time and arrival time of the server are assumed as arbitrary. The system has been analysed stochastically in detail using semi-Markov process and regenerative point technique. The graphical study of the results has also been made.

References
  1. Naidu, R. S. and Gopalan, M. N. (1984): Cost-benefit analysis of one-server two-unit system subject to arbitrary failure, inspection and repair. Journal of Reliability Engg. , Vol. 22, pp. 8-11
  2. Malik, S. C and Anand, Jyoti (2010): Reliability and Economic Analysis of a Computer System with Independent Hardware and Software Failures. Bulletin of Pure and Applied Sciences. Vol. 29E (No. 1), pp. 141-153.
  3. Malik, S. C and Anand, Jyoti (2011): Reliability Modeling of a Computer System with Priority for Replacement at Software Failure over Repair Activities at H/W Failure. International Journal of Statistics and System, ISSN 0973-2675, Vol. 6,No. 3,pp. 315-325.
  4. Malik, S. C. and Anand, J. (2012): Probabilistic Analysis of a Computer System with Inspection and Priority for Repair Activities of H/W over Replacement of S/W. International Journal of Computer Applications, Vol. 44 (1), pp. 13-21.
  5. Malik, S. C and Sureria, J. K. (2012): Profit Analysis of a Computer System with H/W Repair and S/W replacement. International Journal of Computer Applications, Vol. 47, No. 1, pp. 19-26
Index Terms

Computer Science
Information Sciences

Keywords

Computer System H/w Repair S/w Up-gradation Arrival Time Priority and Reliability Measures