Call for Paper - March 2023 Edition
IJCA solicits original research papers for the March 2023 Edition. Last date of manuscript submission is February 20, 2023. Read More

Analyzing Effort Estimation in Multistage based FL-COCOMO II Framework using various Fuzzy Membership Functions

Print
PDF
International Journal of Computer Applications
© 2013 by IJCA Journal
Volume 66 - Number 6
Year of Publication: 2013
Authors:
Kunal Gaurav
Pooja Jha
K. S. Patnaik
10.5120/11092-6051

Kunal Gaurav, Pooja Jha and K S Patnaik. Article: Analyzing Effort Estimation in Multistage based FL-COCOMO II Framework using various Fuzzy Membership Functions. International Journal of Computer Applications 66(6):35-39, March 2013. Full text available. BibTeX

@article{key:article,
	author = {Kunal Gaurav and Pooja Jha and K. S. Patnaik},
	title = {Article: Analyzing Effort Estimation in Multistage based FL-COCOMO II Framework using various Fuzzy Membership Functions},
	journal = {International Journal of Computer Applications},
	year = {2013},
	volume = {66},
	number = {6},
	pages = {35-39},
	month = {March},
	note = {Full text available}
}

Abstract

Software development has always been characterized by some metrics. One of the greatest challenges for software developers lies in predicting the development effort for a software system which is based on developer abilities, size, complexity and other metrics. Several algorithmic cost estimation models such as Boehm's COCOMO, Albrecht's' Function Point Analysis, Putnam's SLIM, ESTIMACS etc. are available but every model has its own pros and cons in estimating development cost and effort. Most common reason being project data which is available in the initial stages of project is often incomplete, inconsistent, uncertain and unclear. In this paper, soft computing based technique is explored to overcome the problems of uncertainty and imprecision resulting in improved process of software development effort estimation. The paper considers a multistage software estimation approach using six key cost drivers in COCOMO II model. The selected cost drivers are the inputs to fuzzy expert systems and the effort multiplier is obtained as output.

References

  • Sandeep Kad, Vinay Chopra, "Fuzzy Logic Based Framework For Software Development Effort Estimation", An International Journal of Engineering Sciences ISSN: 2229-6913 Issue July 2011, Vol. 1.
  • Iman Attarzadeh, Siew Hock Ow, "Proposing a New High Performance Model for Software Cost Estimation", 2009 Second International Conference on Computer and Electrical Engineering, page 112-116.
  • N. E. Fenton, S. L. Pfleeger, Software Metrics, A Rigorous and Practical Approach, 2nd Edition, PWS Publishing Company, Thomson Publishing, Boston, 1997.
  • Iman Attarzadeh, Siew Hock Ow, "Improving Estimation Accuracy of the COCOMO II using an Adaptive Fuzzy Logic Model". 2011 IEEE International Conference on fuzzy Systems, June 27-30, 2011, Taipei, Taiwan.
  • B. W. Boehm, "Cost models for future software life cycle processes: COCOMO 2. 0," Annals of Software Engineering Special Volume on Software Process and Product Measurement, Science Publisher, Amsterdam, Netherlands, 1(3) , pp. 45 – 60. , 1995.
  • Software engineering, K K Aggarwal & Yogesh Singh.
  • Liang tian, Afzel Noore, "Multistage Software Estimation". 2003 IEEE, 232-236.
  • A. Lotfi Zadeh, "The future of soft computing," The 9th IFSA World Congress and 20th NAFIPS International Conference, Vancouver, Canada, pp. 217-228, 2001.
  • A. Idri, A. Abran, and L. Kjiri, "COCOMO cost model using fuzzy logic," in Proceedings of The International Conference on Fuzzy Theory & Technology, 2000.