CFP last date
22 April 2024
Reseach Article

Application of Fuzzy Analytic Hierarchy Method in Software Engineering Scenario

by Hota H.s, Sanjay Kumar Singhai, Ragini Shukla
International Journal of Computer Applications
Foundation of Computer Science (FCS), NY, USA
Volume 57 - Number 21
Year of Publication: 2012
Authors: Hota H.s, Sanjay Kumar Singhai, Ragini Shukla
10.5120/9241-3883

Hota H.s, Sanjay Kumar Singhai, Ragini Shukla . Application of Fuzzy Analytic Hierarchy Method in Software Engineering Scenario. International Journal of Computer Applications. 57, 21 ( November 2012), 45-50. DOI=10.5120/9241-3883

@article{ 10.5120/9241-3883,
author = { Hota H.s, Sanjay Kumar Singhai, Ragini Shukla },
title = { Application of Fuzzy Analytic Hierarchy Method in Software Engineering Scenario },
journal = { International Journal of Computer Applications },
issue_date = { November 2012 },
volume = { 57 },
number = { 21 },
month = { November },
year = { 2012 },
issn = { 0975-8887 },
pages = { 45-50 },
numpages = {9},
url = { https://ijcaonline.org/archives/volume57/number21/9241-3883/ },
doi = { 10.5120/9241-3883 },
publisher = {Foundation of Computer Science (FCS), NY, USA},
address = {New York, USA}
}
%0 Journal Article
%1 2024-02-06T21:01:14.929874+05:30
%A Hota H.s
%A Sanjay Kumar Singhai
%A Ragini Shukla
%T Application of Fuzzy Analytic Hierarchy Method in Software Engineering Scenario
%J International Journal of Computer Applications
%@ 0975-8887
%V 57
%N 21
%P 45-50
%D 2012
%I Foundation of Computer Science (FCS), NY, USA
Abstract

In software engineering scenario, software effort estimation is very uncertain and depends on various external factors . For developing a particular type of software, selection of an optimal and experienced group of developer is essential for software development organization for organizational benefits and is necessary because success and failure of software is highly depends upon experienced team members, but it is not always possible to schedule a suitable team of developer for a specific type of software development from a group of developer ,hence there should be a technique to form a group of developer for specific type of software development for cost effective reason. In this paper multi criteria decision making (MCDM) based fuzzy analytical hierarchy process is applied for formation or selection of software developer team. Fuzzy AHP is a ranking based optimization technique, which decides ranking among various alternatives based on conflict nature of criteria. Three different criteria from COCOMO effort estimation model are considered to decide ranking of three programmers. This technique can be applied for more number of criteria and alternative in real sense in software development scenario.

References
  1. Santanu Kr. Mishra and Amitava Ray, "Software developer selection : a Holistic approach for an eclectic decision" International Journal of Computer Application, volume 47-No. 1,June 2012. pp. 12-18.
  2. Sumeet Kaur Sehra, Yadwinderom Singh Brar, Navdeep Kaur, "Multi Criteria Decision Making Approach for Selecting Effort Estimation Model", International Journal of Computer Applications (0975 – 8887) Volume 39– No. 1, February 2012,pp. 10-17.
  3. F. Ozgur Catak, Servet Karabas,Serkan Yildirim, "Fuzzy Analytic Hierarchy Based DBMS Selection in Turkish National Identity Card management project", IJIS vol. 2,no. 4,July 2012.
  4. Sanjay kumar Dubey and Prof. Ajay Rana, "Analytical Evaluation of Usability of Object Oriented Software system",IJCA,Vol. 49,No. 21,July 2012,pp. 7-13.
  5. Tuli Bakshi and Bijan Sarkar,"MCA Based Performance Evaluation of Project Selection",IJSEA,Vol. 2,No. 2,April 2011,pp. 14-22.
  6. Kevin K. F. Yuen and Henry C. W. Lau, "Software vendor selection using fuzzy analytic hierarchy process with ISO/IEC 9126",IAENG International journal of computer science,advance online publication:21 august 2008.
  7. R. Venkata Rao, "Decision making in the manufacturing environment", Springer-Verlag London Limited,2007.
  8. S. Mahmoodzadeh, J. Shahrabi, M. Pariazar and M. S. Zaeri, "Project Selection by Using Fuzzy AHP and TOPSIS Technique", International journal of Human and Social Science 2:7 2007,pp. 397-402.
  9. Pankaj Jalote,(2005), An Integrated Approach to Software Engineering, Narosa Publishing House.
  10. Roger S. Pressman,(2005),Software Engineering, McGraw Hill Higher Education.
  11. Darko Milicic, "Applying COCOMO II-A Case Study", Master Thesis Software Engineering, Thesis no : MSE-2004-19,August 2004.
  12. Saaty, T. L. , (2001), Decision Making with Dependence and Feedback: Analytic Network Process, RWS Publications, Pittsburgh.
  13. Zhu, K. J. , Jing, Y. , and Chang, D. Y. , "A Discussion on Extent Analysis Method and Applications of Fuzzy-AHP", European Journal of Operational Research, 116, 1999, pp. 450-456.
  14. Ribeiro,R. A. ,(1996),"Fuzzy Multiple Criterion Decision Making: A Review and New Preference Elicitation Techniques", Fuzzy Sets System,78,155-181.
  15. Saaty, T. L. , (1994), "Fundamentals of Decision Making and Priority Theory with the Analytical Hierarchy Process", RWS Publications, Pittsburgh.
  16. Saaty, T. L. , (1980), The Analytical Hierarchy Process, McGraw Hill, New York.
Index Terms

Computer Science
Information Sciences

Keywords

Fuzzy analytic hierarchy process (FAHP) Analytic hierarchy process Software Engineering COCOMO model